Kitchen Remodel Timeline: A Step-by-Step Guide from Rossford Granite Countertop Installer

granite-countertop-installer-rossford-TCC

If you’re planning a kitchen remodel in Rossford, you’re probably buzzing with questions: How long will this take? What comes first? When should I order my countertops? We get it — remodeling can feel like a huge puzzle.

The good news? Once you know the right timeline, it all becomes a lot easier to manage. Whether you’re working with a full-service contractor or doing some of the legwork yourself, knowing when to bring in your Rossford granite countertop installer can save you time, money, and some serious frustration.

Let’s break it all down — week by week, step by step — so you know exactly what to expect from Demo Day to Installation Day.

Kitchen Remodel Timeline Overview (Typical 6–8 Weeks)

Before diving in, here’s a snapshot of what a full kitchen remodel typically looks like:

Phase 1. Design & Planning

Timeframe

2-4 Weeks

Major Milestones

Layout Finalized, Materials Selected

Phase 2. Demolition

Timeframe

2-32 Days

Major Milestones

Old cabinets, countertops, and appliances removed

Phase 3. Rough Construction

Timeframe

1 Week

Major Milestones

Framing, electrical, plumbing updates

Phase 4. Cabinets Installation

Timeframe

3-5 Days

Major Milestones

Base and wall cabinets go in

Phase 5. Countertop Templating

Timeframe

1-2 Days

Major Milestones

After cabinets are secure

Phase 6. Granite Fabrication & Installation

Timeframe

1-2 Weeks

Major Milestones

Your granite gets cut, polished, and installed

7. Plumbing & Finishing Touches

Timeframe

1-2 Days

Major Milestones

Sink, faucet, backsplash, appliances

Phase 8. Final Walkthrough & Punch List

Timeframe

2-4 Weeks

Major Milestones

Layout Finalized, Materials Selected

Phase 1. Design & Planning

Timeframe

1 Day

Major Milestones

Punch list items & cleanup

Phase 1: Design & Planning (2–4 Weeks Before Demo)

This is where your dream kitchen starts taking shape.

What Happens:

  • You meet with a designer or contractor
  • Finalize your layout and cabinet configuration
  • Choose finishes: flooring, cabinets, hardware, lighting, and — yes — countertops

What You Should Know:

Even though granite isn’t installed until later, this is the time to start talking to your Rossford granite countertop installer. Why?

Because:

  • Lead times for slabs and fabrication can vary
  • You may want to visit stone yards to hand-select your granite
  • Your installer can advise on sink type, overhangs, and edge profiles early

Pro Tip:

If you’re choosing granite, visit local suppliers now. Take samples of your cabinets and flooring with you. The colors look very different under showroom lights vs. in your own kitchen.

Phase 2: Demolition (2–3 Days)

Time to say goodbye to that old laminate and those squeaky drawers.

What Happens:

  • Tear out of existing countertops, cabinets, appliances, possibly flooring
  • Haul-away of debris

What You Should Know:

Granite installers don’t play a role here yet — but it’s crucial that all demolition be complete before templating happens later on. Any leftover debris or misalignments could throw off measurements.

Phase 3: Rough Construction (1 Week)

Behind the scenes, your new kitchen is taking shape.

What Happens:

  • Updating wiring, outlets, or lighting locations
  • Adjusting plumbing (especially if you’re moving your sink or dishwasher)
  • Framing changes for walls, islands, or bulkheads

What You Should Know:

Make sure sink decisions are finalized during this phase. Undermount or drop-in? Single or double bowl? Your granite installer will cut to fit the sink you choose, so it has to be locked in well before fabrication begins.

Phase 4: Cabinet Installation (3–5 Days)

This is one of the most exciting phases — your new kitchen finally starts to look real.

What Happens:

  • Cabinets are leveled, secured to walls and floors
  • Islands and peninsulas are built out

Why This Matters for Granite:

Your granite can’t be templated until the cabinets are fully installed, leveled, and secured. Even a ⅛-inch wobble can throw off countertop measurements, leading to gaps or improper support.

Phase 5: Granite Templating (1–2 Days)

Now the countertop journey officially begins.

What Happens:

  • Your Rossford granite countertop installer comes in to measure and create a template of your kitchen
  • Templating involves laser measuring, marking cutouts, and confirming overhangs and seams
  • Final details like sink location, faucet holes, and cooktop sizes are verified

What You Should Know:

  • Cabinets must be complete, with sink and appliances on-site (not installed, just available)
  • Wall treatments like backsplashes can come after granite
  • If you’re using natural stone (like granite), veining direction and seam placement can be discussed now

Pro Tip:

Ask your installer if they offer digital previews. Some shops use software to show how your slab will look once cut, especially helpful for stones with dramatic patterns.

Phase 6: Granite Fabrication & Installation (7–14 Days)

Now the real magic happens.

What Happens:

  • Your granite slab is cut using CNC or waterjet machines
  • Edges are polished to your specifications
  • Holes for sink, faucet, and appliances are added
  • Your countertops are delivered and installed

What You Should Know:

  • Most granite installs take 1 day (sometimes 2 if it’s a large or complex job)
  • After install, the stone is sealed
  • Undermount sinks are typically adhered during this time (but plumbing happens later)

Reminder:

This is where hiring a reputable Rossford granite countertop installer makes all the difference. A poor install can lead to seams that shift, cracks around cutouts, or poor support at overhangs. Choose someone with experience, local references, and in-house fabrication if possible.

Phase 7: Plumbing & Final Finishes (1–2 Days)

We’re almost at the finish line.

What Happens:

  • The sink and faucet are hooked up
  • Garbage disposals and dishwashers are connected
  • Final appliances are installed
  • Backsplash can go in now, if you’re using tile

What You Should Know:

Don’t schedule your plumber the same day as your granite install — sealants need time to cure. Give it at least 24 hours.

Phase 8: Final Walkthrough & Punch List (1 Day)

Time to celebrate — and fine-tune the details.

What Happens:

  • You and your contractor or designer inspect the full kitchen
  • Any minor touch-ups or adjustments are noted
  • Final cleaning and staging can take place

Pro Tip:

Use this time to ask your granite installer about:

  • Long-term sealing schedules
  • Best cleaners for granite
  • Warranty details and maintenance tips

Timeline Recap: When to Book Your Rossford Granite Countertop Installer

Timing is everything when it comes to granite. Here’s a quick timeline to follow:

Task

When to Do It

Start researching granite

During design phase (4–6 weeks pre-demo)

Choose your installer

Before cabinets go in

Templating

After cabinets are installed

Installation

1–2 weeks after templating

Trying to schedule granite install before cabinets are secure? Big mistake.

Calling your installer too late? You may be facing serious delays.

FAQ: Your Top Granite Timing Questions, Answered

Can I install granite before cabinets?

No — granite is measured to the exact dimensions of your cabinets. Even tiny changes in layout or level can ruin the fit.

How long does granite take to install?

1–2 days for most kitchens. Large islands, waterfall edges, or complex seam matching may add time.

Can I use my kitchen immediately after install?

Wait 24 hours before connecting plumbing or heavy appliances. Granite sealants need time to set.

How soon should I call a Rossford granite countertop installer?

As early as possible! Even if install is weeks away, early conversations help with planning, slab selection, and avoiding last-minute stress.

Why Timeline Planning Pays Off

Coordinating a kitchen remodel is no small task. But homeowners who understand the timeline — and work with seasoned professionals — get better results with less stress.

As a local Rossford granite countertop installer, we’ve helped dozens of homeowners navigate their projects smoothly, with:

  • Clear scheduling
  • Expert templating and cutting
  • On-time installations with flawless finishes

Whether you’re working with a general contractor or managing your own project, our team at Toledo Custom Countertops is here to ensure your granite phase is one of the smoothest parts of your remodel.

Wrapping It Up: Your Granite, Your Timeline, Done Right

granite-countertop-installer-rossford-ohio-TCC

A successful kitchen remodel isn’t just about great materials — it’s about when and how they’re installed.

Get the timing right, and your granite will slide into place perfectly. Rush it or delay it, and you could be facing gaps, reschedules, or worse — broken dreams and busted budgets.

So plan ahead, know your phases, and don’t wait until the last minute to call your trusted Rossford granite countertop installer.

Because when everything lines up — demo to delivery — your new kitchen won’t just work beautifully… It’ll feel like home.

Ready to Start Your Kitchen Remodel? Let’s Talk Granite

Whether you’re deep into planning or just starting to explore options, we’re here to help bring your kitchen vision to life — on time, with precision, and built to impress.

Toledo Custom Countertops is your trusted Rossford granite countertop installer, with expert templating, in-house fabrication, and flawless installation services that fit your remodel timeline perfectly.

Showroom Location 1294 Conant Street, Maumee, Ohio 43537 Open: Monday–Friday | 9AM–5PM

Call Us: (419) 324-2480 Email: info@tcctops.com Visit: www.toledocustomcountertops.com

Or fill out our quick contact form, and we’ll get back to you within 1 business day. Whether you need an estimate, stone advice, or just want to see what’s possible — we’re ready when you are.